Eastside Lateral Phase 2 and Eastside Sub-Laterals Pipeline Improvement Project, Hood River, OR

Hood River County

Owner Reference: 4010060

Bid Date: 01/16/2025 at 02:00pm
25 Days until bid date

Pre-Bid: 12/17/2024 @ 01:00pm

Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors

The Project consists of supply and installation of approximately 26,000 LF of 28"-42" HDPE pipe, several thousand feet of 2"-12" pipe, 2 large pressure reducing stations, several smaller pressure reducing and pressure relief stations, pipeline appurtenances, irrigation connections, stormwater culverts, and other work. Materials are primarily contractor-supplied. Prevailing wages.

Niklas Christensen
 Login or create an account
 Login or create an account

Owner: East Fork Irrigation District OR

Published 12/11/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.