ID 733161
Lane County
Bid Date: 12/16/2024 at 03:00pm
Estimate: $1,475,000
Trades: Design/Build Contractor; Design/Bid/Build Entity (DBBE), *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, Earthwork & Paving Contractor: Resurface, Coat, Highway, Roads, Bridges, Overpasses, Runways, Asphalt, Land Clearing, Trails & P, *A&E Architecture, Engineering & Design: Professional, Consultant, Consulting & Planning Services
It is the intent of the City of Eugene to solicit proposals for a Design-Build contract for the construction of the South Eugene Meadows Trail project. The project scope for the trail work is the construction of an approximately 2.5-mile extension of the Ridgeline Trail from 52nd and Willamette west to and through South Eugene Meadows Park with a terminus at Blanton Road. The trail has been aligned with a gradual slope to accommodate a wide range of users including mountain bikes and effectively opens the 194-acre South Eugene Meadows Park up to recreational use within some of Eugene’s most scenic park land Prevailing wages.
Noel Dietz
Login or create an account
Login or create an account
Owner: City of Eugene OR
Published 12/02/2024 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.