Safe Routes to School Project, Mill City, OR

Linn County

Bid Date: 12/05/2024 at 03:00pm

Estimate: $ 2,017,000.00

Trades: Pipeline Contractor: Water Mains, Water Lines, Sewer Lines + Related Structures; Includes Pipe Inspection Camera, *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors

The project generally includes installation of 830 linear feet of 12-inch Class 52 Cement Lined Ductile Iron Pipe (DIP) and associated appurtenances (i.e., valves, connections, etc.) within an existing public right-of-way, full depth pavement construction, construction of approximately 3,500 linear feet of new curb, gutter, Americans with Disability Act (ADA) crossings, and sidewalks of varying widths, construction of a stormwater planter, installation of new stormwater inlets, catch basins and manholes, and all labor, Equipment, Materials, and incidentals necessary to complete the Work as specified.

Shannon Williams
 Login or create an account
 Login or create an account

Owner: City of Mill City OR

Published 11/22/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.