ID 722272
Multnomah County
Owner Reference: ITB-6-2025
Bid Date: 10/29/2024 at 02:00pm
Pre-Bid: 09/19/2024 @ 01:00pm
Estimate: $15M - $16 Million
Trades: *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors
Must be prequalified. The Work to be done under this Contract consists of the following: 1. Reconstruct Broadway Bridge structural deck on the bascule leaves. Add to existing counterweights and balance bascule spans. 2. Adjust live load bearings, anchor struts, and span locks, as required. 3. Reconstruct light rail tracks. 4. Install stormwater treatment. 5. Perform additional and Incidental Work as called for by the Specifications and PlansFederally funded - DBE 9% goals. Bonds required. Prevailing wages.
Tessa Godat
Login or create an account
Login or create an account
Owner: County of Multnomah OR
Published 09/15/2024 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.