Marion County Building and Piping Revisions, Monmouth, OR

Polk County

Bid Date: 12/17/2024 at 02:00pm
13 Days until bid date

Trades: Site Preparation, Sitework, Prep Work & Prepwork, Demolition Contractor, Building Moving, Wrecking & Hauling, Water Well Construction & Waterworks: Drilling, Installation, Improvements & Repairs - General Engineering Contractor

The proposed work will consist of one (1) schedule of itemized work: Mobilization and site preparation, provide and install a 40 HP submersible well pump and appurtenances, 340' +/- of a buried 10" PVC transmission main, extension of existing 6" and 8" piping to a new location, provide and install a new piping and fitting manifold, removal of a standby engine, demolition of an existing CMU building extension, wood-framed interior room, concrete floor slab, and foundation, reconstruction of a new concrete floor slab and CMU wall, relocation of doors, abandonment of an existing 12" water well, cleanup and startup. Bonds required.

Russ Cooper
 Login or create an account

Owner: City of Monmouth OR

Published 11/29/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.