Aquifer Storage and Recovery Improvements - Phase 1 - 2025, Hermiston, OR

Umatilla County

Bid Date: 02/18/2025 at 11:00am

Pre-Bid: 01/29/2025 @ 11:00am

Estimate: $4.9 to $5.4 million

Trades: Water Well Construction, Watershed Improvements & Water Tables Aquifer Storage, Drilling, Installation & Repairs, Pipeline Contractor: Water Mains, Water Lines, Sewer Lines + Related Structures; Includes Pipe Inspection Camera, Reservoirs, Lakes, Streams, Ponds, Channels, Water Barriers, Aquatic Plants, Wetland Restoration, Living Shorelines NAICS 562998

The Project includes the following Work: Drilling of a new well; furnishing and installing surface casing, 24-inch casing, and 12-inch liner assembly; grouting of the well where required; well development and pump testing; and furnishing and installing a well pump, discharge head, column pipe, and downhole well control valve. The Work also includes site work, installation of water main lines, electrical service, construction of a temporary building, and construction of an infiltration pond, together with all other work required to complete the Project as shown on the Drawings and described in the Technical Specifications. Prevailing wages.

Mark Morgan
 Login or create an account
 Login or create an account

Owner: City of Hermiston OR

Published 01/28/2025 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.