Engineering & Ops Space Reoganization, Beaverton, OR

Washington County

Owner Reference: C12636

Bid Date: 11/14/2024 at 02:00pm

Pre-Bid: 10/24/2024 @ 02:00pm

Trades: *General Building Contractor GBC: Building Construction Services; Opportunities for Subcontractors

The Project consists of furnishing required labor, equipment, and materials for construction of the following: The Project is an interior alteration of two office departments (Engineering and Operations) with minor exterior work. The scope incorporates: Creation of four new offices through the subdivision of two existing large offices and a meeting room. Upgrade of fluorescent light fixtures to LED light fixtures and associated controls in the interior area of work. New roof top unit (RTU) to provide a new HVAC system for the engineering office area. Scope includes structural support of the roof at the roof top unit, associated roof repair and rework of the existing system above the ceiling. New tubular daylighting devices and controls in the Engineering Office area to provide additional daylighting to the space. Scope includes additional structural support of the roof and associated roof repairs. Creation of a new exterior exit door and window in the Engineering Office space. Work includes removal and replacement of one existing exterior window and replacement with a new exit door, sidelight, modification of existing landscape and irrigation to create a new concrete landing and walk connection to the adjacent existing walk and new exterior light at the door. Rework of interior mechanical (HVAC), electrical, telco, and plumbing systems per new furniture and equipment layouts, partition modifications, lighting, and HVAC modifications. Repainting area of work and repairing walls, ceiling, floors and wall base as noted. Rework of sprinkler and fire alarm system as required in the area of work. (Delegated design to contractor) Coordination with owner for dust and sound control, access control, protection and safety measures as facility will be occupied during construction. Area of work will be vacated. Coordination with owner security vendors. Bidders are required to submit a First Tier Subcontractor Disclosure Form. Bonds required. Prevailing wages.

Matt Oglesby, email only
 Login or create an account
 Login or create an account

Owner: Tualatin Valley Water District (TVWD) OR

Published 10/16/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.