2025 Cured-in-Place Pipe Project, Tualatin, OR

Washington County

Bid Date: 02/12/2025 at 02:00pm

Trades: Sewer Pump System, Sewer Connection, Septic Tanks & Systems Contractor: OnSite Sewage Facility (OSSF); CIPP liners, Roadway Drainage, Stormwater, Manholes & Valve Boxes, Ditches, Culverts, Shoulder Work, Underdrains, Dewatering, Water Swales

Major items of work consist of the rehabilitation of approximately 3,101 LF of existing 8” sewer mains and 1,370 LF of 10” sewer mains using cured-in-place-pipe (CIPP), reinstatement of 26 laterals, rechanneling manholes and related work. Bonds required. Prevailing wages.

Bert Olheiser
 Login or create an account
 Login or create an account

Owner: City of Tualatin OR

Published 01/28/2025 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.