Preventive Maintenance, US 287, Armstrong Co, TX

Armstrong County

Owner Reference: 0042-03-047

Bid Date: 11/06/2024 at 01:00pm

Estimate: $21,255,075.38

Trades: Road Improvements: Pavement Resurface Seal Coat for Highway Roads Bridge Dam Overpass, Runways - NAICS 237310, *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors , Pavement Marking, Traffic Striping, Raised Pavement Markers (RPMs) & Reflectors - General Engineering Contractor

This is a solicitation for contractors interested in entering into a State Let Construction Contract consisting of preventive maintenance, overlay, on US 287 from the Carson County Line to 8.6 miles east (8.1680 miles) and on US 287 from the Carson Co Line to CR 4 (3.1140 miles) in Armstrong County, TX. Notarized Buy America Certification Form required for all items classified as construction materials. DBE Goal: 0%. Bonds required. Prevailing wages.

Zachary Mayer
 Login or create an account
 Login or create an account

Owner: Texas Department of Transportation DOT CL Austin HQ-Riverside Annex, TX

Published 10/14/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.