ID 735416
Bastrop County
Owner Reference: WWW-2025-01
Bid Date: 01/29/2025 at 10:00am
38 Days until bid date
Pre-Bid: 01/15/2025 @ 10:00am
Trades: Wastewater Treatment Plant/Facility Construction & Repairs WWTP/WRF/OSSF OnSite Sewer, Lift Station, Pipeline Contractor: Water Mains, Water Lines, Sewer Lines + Related Structures; Includes Pipe Inspection Camera
The general scope of the City of Bastrop WWTP No. 1 and No. 2 Rehabilitation, 2025 project includes the following primary tasks: 1. Construct plant flow diversion system, including replacement of existing plant lift station pumps, plant yard piping modifications, and piping modifications at the offsite Central Lift Station location. 2. Activate the plant flow diversion system and de-activate WWTP No. 1 and No. 2. 3. Remove existing water and solids from the interior of WWTP No. 1 and No. 2. 4. Pressure wash tank interiors and identify scope of necessary repairs of WWTP No. 1 and No. 2. 5. Complete repairs and paint interiors of WWTP No. 1 and No. 2. 6. De-activate the plant flow diversion system and re-activate WWTP No. 1 and No. 2 Bonds required. Prevailing wages.
Jimmie Campbell
Login or create an account
Login or create an account
Owner: City of Bastrop TX
Published 12/18/2024 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.