Lakecliffe Drive Rehabilitation - Phase II, Harker Heights, TX

Bell County

Owner Reference: 2024-159

Bid Date: 12/05/2024 at 02:00pm

Pre-Bid: 11/19/2024 @ 02:00pm

Trades: Stormwater Prevention Plan (SWPP), Regional Flood Planning Group (RFPG), Floodproofing & Flood Risk/Pollution Reduction, Traffic Signals, Traffic Calming, Intersection Automated Enforcement Systems, Speed Safety Camera Equipment, Controls/Monitoring, Roadway Drainage, Stormwater, Manhole Covers & Valve Boxes, Ditches, Culverts, Shoulder Work, Underderdrains, Dewatering, Road S, Vegetation Control & Wildfire Prevention: Burning, Fire Prevention, Mitigation & Mastication, Road Improvements: Pavement Resurface Seal Coat for Highway Roads Bridge Dam Overpass, Runways - NAICS 237310, *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors

General Conditions: Mobilization & Bonds. Storm Water Pollution Prevention Plan and Implementation. Traffic Safety Plan and Implementation. Revegetation of Disturbed Areas. Drainage Improvements: Culvert Replacement (18” and 24” RCP with Headwalls/SET). Mortared Rock Riprap. Roadway Reconstruction (Excavation, Installation of New Base Material) or Cement Stabilization of Existing Material. Asphalt Overlay. Bonds required. Prevailing wages.

John Simcik, PE c/o KPA Engineers
 Login or create an account
 Login or create an account

Owner: City of Harker Heights TX

Published 11/24/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.