Talley Rd. and Sable Run Pressure Zone Interconnections Project, San Antonio, TX

Bexar County

Owner Reference: 21-7004

Bid Date: 10/08/2024 at 10:00am

Pre-Bid: 09/13/2024 @ 10:30am

Estimate: $1,500,000.00

Trades: Roadway Drainage, Stormwater, Manhole Covers & Valve Boxes, Culverts: Installation, Repair & Removal, Supervisory Control & Data Acquisition (SCADA): Controllers, Process & Data Automation: Hardware/Software on High-Level Machiner, Road Improvements: Pavement Resurface Seal Coat for Highway Roads Bridge Dam Overpass, Runways - NAICS 237310, *General Engineering Contractor GEC; Subcontractor Opportunities

Sealed bids are requested by the San Antonio Water System (SAWS) for the construction of one new pressure reducing valve structure (PRV) to be located near Talley Rd. and Earl Roberts Rd. in the far northwest part of Bexar County. Talley Rd. will install a new 12-inch PRV serving Pressure Zone 1044 from Pressure Zone 1111. On Sable Run, electrical and SCADA work will be performed on the existing PRV structure for the Talley Rd. and Sable Run Pressure Zone Interconnections Project, SAWS Job No. 21-7004. Bonds required. Prevailing wages.

Stephen Muñiz
 Login or create an account
 Login or create an account

Owner: San Antonio Water System (SAWS) TX

Published 09/04/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.