Trades: HVAC Contractor: Heating Ventilating Air Conditioning & Controls, Air Handler/Air Chillers. Includes RTU's, *General Building Contractor GBC: Building Construction Services, Subcontractor Opportunities
1. Replacing one of the two existing chiller (Chiller #2) with Carrier 30XV300 VFD Screw Unit (see Exhibit A). The existing chiller is Trane, model RTAA, 300-ton capacity. The new equipment will be a Carrier 30XV300 VFD Screw Unit. No substitutions will be allowed. 2. Removing the existing 3-ton chiller servicing the two-story ADC Annex. The chiller is located outdoors on ground level within the secured perimeter fencing. 3. Contractor must be responsible to make all the necessary temporary utility disconnects, removing equipment and disposing accordingly. 4. Contractor must re-use existing concrete housekeeping pad to support the new equipment. contractor must be responsible to secure equipment to the pad. 5. Making all final utility connections and bringing equipment back on-line. Existing utilities servicing equipment to remain. The chiller must be connected to existing chill water system as the existing chiller. Bonds required. Prevailing wages.
Jose Chavarria
Login or create an account
Login or create an account
Owner: County of Bexar TX
Published 09/14/2024 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.