ID 728511
Bexar County
Owner Reference: 2410-5541
Bid Date: 11/19/2024 at 11:00am
Trades: *General Building Contractor GBC: Building Construction Services; Opportunities for Subcontractors
Remodel of Unit 1-107 at Costa Valencia Floor Plan- 1163 SqFt ~ 3 bedroom / 2 bath This is a full turnkey project. We will supply all materials needed to complete except for kitchen cabinets. An onsite visit will be mandatory General: 1. Install approximately 1,511 Sqft of ½” sheetrock ( Walls ) 2. Install approximately 1,163 SqFt of ⅝” Sheetrock ( Ceilings ) 3. Tape, Float, and Texture ( Heavy Orange Peel ) approximately 11,630 SqFt of both walls and ceilings 4. Patch approximately 20 SqFt of existing sheetrock holes 5. Paint approximately 1.163 SqFt of Ceilings ( Eggshell white ) 6. Paint approximately 10,467 SqFt of Interiors walls, all interior doors, trim, and baseboards 7. Install 10 interior pre-hung doors 8. Install 340 linear feet of door casing 9. Install all interior hardware including doorknobs, door hinges, and door stops 10. Install 277 linear feet of baseboards 11. Install 27 linear feet of window stool and casing 12. Install 12 interior LED light fixtures 13. Install 4 ceiling fans 14. Install 16 window mini blinds 15. Install 5 hardwire smoke detectors 16. Install 2 exhaust fans 17. Install 66 LFT of closet shelving Bathroom: 18. Install 1- 5 ft steel tub with approximately 77 SqFT of Hardi Backer and Tile 19. Install 1- Garden Tub ( 41”x 5 ft ) with approximately 78 SqFt of Hardi Backer and Tile 20. Install 2- Toilets to include flange, wax ring, and supply line 21. Install 1- 36” vanity cabinet with top 22. Install 1- 48” vanity cabinet with top 23. Install 2- vanity mirrors 24. Install all interior hardware including doorknobs, door hinges, door stops, & bathroom towel bar sets Kitchen: 25. Need to manufacture, install, and paint birch plywood cabinets for the kitchen 26. Approximately 16 LFT of base cabinet 27. Approximately 15 LFT of wall cabinets 28. 2x5 Island cabinet with custom countertop 29. Approximately 10 ft of countertop 30. Install a 24” dishwasher and all plumbing 31. Install a 30” electric stove 32. Install a 18 CuFT refrigerator 33. Install a 30” Non-Vented Vent Hood 34. Install a 36” kitchen sink to include faucet and all necessary plumbing ~ All debris will be removed by the Contractor and disposed of appropriately off-site/property. Bonds required. Prevailing wages.
Shayne Everett-Endres
Login or create an account
Login or create an account
Owner: Opportunity Home San Antonio (formerly SAHA) TX
Published 10/29/2024 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.