2021 CMOM Package 5 - CIPP Project, San Antonio, TX

Bexar County

Owner Reference: CO-00738-SM

Bid Date: 01/08/2025 at 10:00am
17 Days until bid date

Pre-Bid: 12/13/2024 @ 10:30am

Trades: Pipeline Contractor: Water Mains, Water Lines, Sewer Lines + Related Structures; Includes Pipe Inspection Camera, Sewer Pump System, Sewer Connection, Septic Tanks & Systems Contractor: OnSite Sewage Facility (OSSF); CIPP liners, Roadway Drainage, Stormwater, Manhole Covers & Valve Boxes, Ditches, Culverts, Shoulder Work, Underderdrains, Dewatering, Road S, Traffic Signals, Traffic Calming, Intersection Automated Enforcement Systems (AES), Speed Safety Cameras, Flashing Beacons, *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors

Sealed bids are requested by the San Antonio Water System for rehabilitating approximately 2,679 linear feet of 8” sanitary sewer main and 70 linear feet of 24” sanitary sewer main using cured-in-place pipe including associated manhole improvements, bypass pumping and traffic control for the 2021 CMOM Package 5 - CIPP Project, SAWS Job No. 24-4506. Bonds required. Prevailing wages.

Stephen Muñiz
 Login or create an account
 Login or create an account

Owner: San Antonio Water System (SAWS) TX

Published 12/07/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.