**NEW BID DATE**BCMUD 32 WP No. 2 Ph 1, The Woodlands, TX

Brazoria County

Owner Reference: 610.002.025.00

Bid Date: 12/05/2024 at 10:00am
11 Days until bid date

Pre-Bid: 11/06/2024 @ 10:00am

Trades: Wastewater Treatment Plant Construction & Repairs WWTP/WRF/OSSF OnSite Sewer Facilities Lift Station, Water Well Construction & Waterworks: Drilling, Installation, Improvements & Repairs - General Engineering Contractor, Generator Contractor - Electrical & Power Provider, Backup Battery Systems & Uninterrupted Power Supply (UPS) Systems, Earthwork & Paving Contractor, Asphalt, Land Clearing, Path & Trail Construction: General Engineering Contractor, Fencing Contractor: Heavy Fences, Security Gates, Ornamental Iron, Tide Gates for Tidal Water - Rivers/Oceans, *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors

Scope of Work of the Contract Documents includes the following: Construction of a fully functional Phase 1 Water Plant to include one 600 gpm water well, one 245,217-gallon bolted steel ground storage tank, four 40 HP booster pumps, a 15,578-gallon hydropneumatics tank, a chlorine gas disinfection system, and a 250-kW diesel generator, paving and site work,, enclosed within an 8-foot-high CMU fence, a Detention pond and storm improvements. Bonds required. Prevailing wages.

Construction Admin
 Login or create an account
 Login or create an account

Owner: Brazoria County MUD32 Municipal Utility District TX

Published 11/04/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.