ID 729669
Brazoria County
Owner Reference: 081-011-26-02 DST (J) / ROAD (L)
Bid Date: 11/19/2024 at 02:30pm
Pre-Bid: 11/12/2024 @ 02:30pm
Trades: Pipeline Contractor: Water Mains, Water Lines, Sewer Lines + Related Structures; Includes Pipe Inspection Camera , Sewer Pump System, Sewer Connection, Septic Tanks & Systems Contractor: OnSite Sewage Facility (OSSF); CIPP liners, Earthwork & Paving Contractor, Asphalt, Land Clearing, Path & Trail Construction: General Engineering Contractor, *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors
Project scope shall include the installation of approximately 2,945 LF of 6”-8” PVC waterline; 3,173 LF of 8”-12” PVC sanitary sewer; 2,178 LF of 24”-60” RCP storm sewer; and 10,164 SY of 6” concrete paving. Bonds required. Prevailing wages.
EHRA Engineering
Login or create an account
Owner: Brazoria County MUD57 Municipal Utility District TX
Published 11/06/2024 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.