Water, Sanitary Sewer and Drainage Facilities and Paving and Appurtenances to Serve Dogwood Avenue - Segment B and Valencia Section 13, Katy, TX

Brazoria County

Owner Reference: 2791-8006 & 2791-4113

Bid Date: 12/03/2024 at 10:00am
11 Days until bid date

Pre-Bid: 11/19/2024 @ 10:00am

Trades: Pipeline Contractor: Water Mains, Water Lines, Sewer Lines + Related Structures; Includes Pipe Inspection Camera , Sewer Pump System, Sewer Connection, Septic Tanks & Systems Contractor: OnSite Sewage Facility (OSSF); CIPP liners, Roadway Drainage, Stormwater, Manhole Covers & Valve Boxes, Ditches, Culverts, Shoulder Work, Underderdrains, Dewatering, Road S, Earthwork & Paving Contractor, Asphalt, Land Clearing, Path & Trail Construction: General Engineering Contractor, *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors

Scope of Work of the Contract includes the Construction of the water, sanitary sewer, and drainage facilities and paving and appurtenances. Bonds required. Prevailing wages.

Hannah Horsfield, P.E.
 Login or create an account

Owner: Brazoria County MUD83 Municipal Utility District TX

Published 11/11/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.