Wickson Creek Special Utility District 2023 Transmission Main Bid Package 1, Longview, TX

Brazos County

Owner Reference: Wickson Creek Special Utility District 2023 Transmission Main Bid Package 1 (WCSU2300918.00-B1)

Bid Date: 11/07/2024 at 02:00pm

Trades: Pipeline Contractor: Water Mains, Water Lines, Sewer Lines + Related Structures; Includes Pipe Inspection Camera , Tank Services: Installation & Cleaning, Pressure Washing: Fiberglass, Steel or Concrete Tanks - General Engineering Contractor, *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors

Construction of a section of water transmission/distribution pipeline with an anticipated diameter of 30". Approximately 3.69 miles starting at 7300 E State Highway 21 and heading southeast to FM 1179 to tie into the existing ground storage tank site at Plant No.3 located at 6705 FM 1179. The Drawings are organized into two Volumes. Volume 1 consists of approximately 1.63 miles starting at Old Reliance Road and terminating in the ground storage tank at Plant No.3. Volume 2 consists of approximately 2.06 miles starting at State Highway 21 and terminating by tying into Volume 1 at Old Reliance Road. Bonds required. Prevailing wages.

Beth Kochur
 Login or create an account
 Login or create an account

Owner: Wickson Creek SUD Special Utility District TX

Published 10/18/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.