CRWA Hays/Caldwell Water Treatment Plant Improvements Project Phase 2, New Braunfels, TX

Caldwell County

Owner Reference: 2024-006

Bid Date: 01/24/2025 at 02:00pm
33 Days until bid date

Pre-Bid: 12/05/2024 @ 02:00pm

Trades: Wastewater Treatment Plant/Facility Construction & Repairs WWTP/WRF/OSSF OnSite Sewer, Lift Station, Low Voltage Electrical Contractor (LVE) <91V: Residential Wiring, Telephone/Sound/Cable TV Systems, Fiberoptic, Fiber Optic, , Supervisory Control & Data Acquisition (SCADA): Controllers, Process & Data Automation: Hardware/Software on High-Level Machiner, HVAC Contractor: Heating Ventilating Air Conditioning & Controls, Exhaust Systems, Air Handler/Air Chillers. Includes RTU's, Pipeline Contractor: Water Mains, Water Lines, Sewer Lines + Related Structures; Includes Pipe Inspection Camera, Demolition Contractor, Building Moving, Wrecking & Hauling, Erosion Control: Bank Stabilization, Straw Bombing, Earth, Soil, Sand & Beach Replenishment, Roadway Drainage, Stormwater, Manholes & Valve Boxes, Ditches, Culverts, Shoulder Work, Underdrains, Dewatering, Water Swales, Earthwork & Paving Contractor: Resurface, Coat, Highway, Roads/Runways Bridges, Overpasses, Asphalt, Land Clearing, Trails/Paths, *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors

A. The scope of work includes but is not limited to: 1. Furnish and install Ozone Building to house ozone generation equipment and new electrical room, associated process mechanical equipment, valves and piping, architectural, structural, HVAC, electrical, instrumentation control and SCADA integration. 2. Furnish and install a Contact/Off-gas Structures and Ozone Destruct Structure and associated work. 3. Furnish and install a liquid oxygen containment equipment pad and associated work. 4. Furnish and install Ozone Generation and Feed System Equipment, and start-up and testing planning and execution including all coordination of testing, startup planning and coordination, and successful startup, testing and acceptance of new and modified systems as shown on the Drawings and specified herein. 5. Yard piping modifications and improvements as shown on the Drawings. 6. Miscellaneous site civil improvements including site demolition, erosion control, site restoration, paving, grading, drainage etc. as described in the Contract Documents and as shown on the Drawings. 7. Miscellaneous electrical improvements and instrumentation and controls including instrumentation integration and appurtenances described in the Contract Documents and as shown on the Drawings’ B. Bid Alternate 1: 1. Rehabilitation of the existing 1-MG steel ground storage tank. The rehabilitation shall be performed after Phase 1 construction of the new 1-MG prestressed concrete ground storage tank is complete and the tank is placed in service. Phase 1 GST improvements are currently under construction by DN Tanks. Bonds required. Prevailing wages.

Hanna Diaz
 Login or create an account
 Login or create an account

Owner: Canyon Regional Water Authority

Published 12/18/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.