Ramble Phase 1C/1D & Coit Road Water, Sewer and Storm Improvements, Frisco, TX

Collin County

Owner Reference: Ramble Phase 1C/1D & Coit Road Water, Sewer and Storm

Bid Date: 11/22/2024 at 11:00am
1 Days until bid date

Pre-Bid: 11/15/2024 @ 10:00am

Trades: Pipeline Contractor: Water Mains, Water Lines, Sewer Lines + Related Structures; Includes Pipe Inspection Camera, Sewer Pump System, Sewer Connection, Septic Tanks & Systems Contractor: OnSite Sewage Facility (OSSF); CIPP liners, Roadway Drainage, Stormwater, Manhole Covers & Valve Boxes, Ditches, Culverts, Shoulder Work, Underderdrains, Dewatering, Road S, *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors

Phase 1C/1D & Coit Road Water, Sewer and Storm Improvements for Ramble, 376-lots of a total 636-lot residential subdivision, in Celina, Texas. Bonds required. Prevailing wages.

David Barton
 Login or create an account
 Login or create an account

Owner: Celina MUD2 Municipal Utility District TX

Published 11/19/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.