ID 733224
Collin County
Owner Reference: 2024-458
Bid Date: 01/23/2025 at 02:00pm
50 Days until bid date
Pre-Bid: 12/19/2024 @ 02:00pm
Estimate: $44,204,131.00
Trades: Earthwork & Paving Contractor, Asphalt, Land Clearing, Path & Trail Construction: General Engineering Contractor, Roadway Drainage, Stormwater, Manhole Covers & Valve Boxes, Ditches, Culverts, Shoulder Work, Underderdrains, Dewatering, Road S, Road Improvements: Pavement Resurface Seal Coat for Highway Roads Bridge Dam Overpass, Runways - NAICS 237310, Concrete Contractor: Sidewalks, Curbs, Gutters, Driveways, Handicap ADA Ramps. Pedestrian Improvements, CIP Concrete NIGP 913-47, Pavement Marking, Traffic Striping, Raised Pavement Markers (RPMs) & Reflectors - General Engineering Contractor, Fencing Contractor: Heavy Fences, Security Gates, Ornamental Iron, Tide Gates for Tidal Water - Rivers/Oceans
The Park Boulevard Extension Paving and Drainage Improvements project includes construction of 4-lanes of an ultimate 6-lane divided roadway from just west of Parker Road to just north of State Highway 78 with an underground storm sewer system, a 1,300-foot bridge over the Kansas City Southern (KCS) railroad, open channels and culverts. Other major items of work include construction of embankment and retaining walls for elevated sections of the roadway, unclassified roadway excavation, reinforced concrete pavement and sidewalks, storm sewers, culverts and headwalls, inlets and manholes, concrete rip-rap and protection stone rip-rap, signs and pavement markings, metal beam guard fence, and railing. Additional items of work include removal of existing reinforced concrete and asphalt pavement, temporary traffic handling devices and temporary asphalt pavement and other items to provide a complete operable section of roadway. Bonds required. Prevailing wages.
Login or create an accountOwner: County of Collin TX
Published 12/03/2024 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.