**NEW BID DATE**Airfield Safety and Efficiency Improvements, Package 3, Dallas-Fort Worth, TX

Dallas County

Owner Reference: PA1546

Bid Date: 11/13/2024 at 02:00pm

Pre-Bid: 10/02/2024 @ 02:00pm

Estimate: $105,111,706.00

Trades: Erosion Control: Bank Stabilization, Straw Bombing, Earth, Soil, Sand & Beach Replenishment, Demolition Contractor, Building Moving, Wrecking & Hauling, Road Improvements: Pavement Resurface Seal Coat for Highway Roads Bridge Dam Overpass, Runways - NAICS 237310, Concrete Repair & Restoration Services, including Gunnite & Grouting Contractor, Pavement Marking, Traffic Striping, Raised Pavement Markers (RPMs) & Reflectors - General Engineering Contractor, Roadway Drainage, Stormwater, Manhole Covers & Valve Boxes, Ditches, Culverts, Shoulder Work, Underderdrains, Dewatering, Road S, *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors

Work of this Contract includes, but is not necessarily limited to the following: Procurement, placement, relocation, and removal of temporary lighted lowprofile barricades and taxiway closure markers as shown on the plans or as directed by the Owner’s Authorized Representative (OAR). Procurement, placement, relocation, and removal of temporary traffic control devices as shown on the plans or as directed by the OAR. Procurement, placement, maintenance, and removal of temporary erosion. Construction of staging area. Demolition and disposal of existing parking lot concrete pavements. Demolition and disposal of existing parking lot retaining walls. Demolition and disposal of existing gates and associated equipment. Demolition and disposal of existing utilities and associated elements. Protection of existing utilities. Restoration of disturbed areas with sod. Construction of concrete pavement section expanding the existing ramp. Application of additional apron entrance points (AEPs) and other pavement markings. Pavement marking removals. Replace Terminal C south and Terminal A north open pit style triturators with new closed connection style triturators. Procurement and installation of sanitary sewer lines and connections at Terminal C south and Terminal A north triturators. Repair Terminal C south and Terminal A north triturators’ bay awnings, including removal and replacement of corrugated metal roofs, damaged structural beams, and canopies. Repair cracks in blast wall adjacent to Terminal C south and Terminal A north triturators’ bay. o Install new H-20 inlet and oil water separator at Terminal C south and Terminal A north triturators. Install new degerm mixing station at Terminal C south and Terminal A north triturators. Install new shower, foot wash, sink, eye wash station, drinking fountain, and fixtures at Terminal C south and Terminal A north triturators. Demolition and disposal of existing airfield concrete ramp pavement. Demolition and disposal of concrete ARFF road pavement. Demolition and disposal of asphalt taxiway shoulder. Demolition and disposal of storm drain structures. Demolition and disposal of taxiway guidance lights. Demolition and disposal of taxiway edge lights. Demolition and disposal of underground storage tanks. Bonds required. Prevailing wages.

James Legerme, via email only
 Login or create an account
 Login or create an account

Owner: Dallas-Fort Worth International Airport (DFW) TX

Published 09/25/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.