ID 730073
Dallas County
Bid Date: 12/19/2024 at 02:00pm
28 Days until bid date
Pre-Bid: 11/19/2024 @ 10:00am
Estimate: $1,033,173.79
Trades: Security System Services: Access Control, FOB systems, CCTV & Video Surveillance, Intrusion Alarm Systems, (Except Locksmiths) N, *General Building Contractor GBC: Building Construction Services; Opportunities for Subcontractors, Waterproof & Weatherproof Services, Pavement Marking, Traffic Striping, Raised Pavement Markers (RPMs) & Reflectors - General Engineering Contractor, Electrical Signs & Signage Contractor: Exterior Advertising or Wayfinding, Fire Protection Systems, Fire Alarm & Fire Suppression Contractor, Fire Pumps & Fire Hydrants, High Voltage Electrical Contractor (HVE): Transmission Lines, Power Lines, Venues, Arenas, Utility, Transformers, Awning Contractor: Canopies, Carports, Shade Structures, Patio Covers, Pergolas, Arbors, Trellises, & Soffit, Roofing Contractor, Facia Board & Soffit Replacement: General Building Contractor
Project consists of the following: 1. Security infrastructure for new cameras and door access hardware. 2. Renovating the front entry and front of house of admin office to create a secure front vestibule. 3. Removing and replacing all failing waterproofing sealant at all tilt up concrete control joints and expansion joints. 4. Installing directional pavement arrows and signage for parent drop off and pick up loop as well as crosswalks. 5. Removal and replacement of fire alarm panel and all components throughout campus. 6. Installing new exterior lighting controls. Removing existing non-LED light pole fixtures and replacing them with new LED fixtures while using existing pole and electrical connections. Replacing existing under canopy non-LED exterior light fixtures and wall packs for the whole campus. 7. Scope includes new split systems along with all components for the IDF/MDF air conditioning. Would include roof work at the location of exterior condensing units. 8. Add Alternate – Removing existing non-digital marquee and installing new digital marquee. Scope would include a new foundation, masonry, sign, electrical, and landscape repair. 9. 10. Add Alternate – Removing and replacing existing exterior hose bibs. 11. Add Alternate – Removing the existing failing sunken concrete paving, backfilling, and installing new reinforced concrete paving. 12. Add Alternate – Replacing an existing hollow metal door with new hollow metal door and no access hardware, Bonds required. Prevailing wages.
Walter Perez
Login or create an account
Login or create an account
Owner: Dallas ISD Independent School District TX
Published 11/10/2024 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.