Eastside Utility Plant Soil Erosion Rehabilitation, Dallas-Fort Worth, TX

Dallas County

Owner Reference: PA1563

Bid Date: 01/02/2025 at 02:00pm
11 Days until bid date

Pre-Bid: 12/05/2024 @ 02:00pm

Estimate: $905,166.00

Trades: Wastewater Treatment Plant Construction & Repairs WWTP/WRF/OSSF OnSite Sewer Facilities Lift Station, Material Testing & Monitoring Services, *General Building Contractor GBC: Building Construction Services; Opportunities for Subcontractors, *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors

The project’s objective aims to rehabilitate the soil’s stability at the Eastside Utility Plant, which is crucial for maintaining the current and the future operations of the airport. The issue of ground instability has negatively affected the utilities supported by the East Side Utility Plant building, posing risks to its functionality and structural stability. During the design phase, it was confirmed that the integrity of the soil beneath the structure has not been compromised. This assessed via the performance of the geo-technical investigation through soil boring and soil compaction tests. Those tests have been conducted under the foundation, by which, verified the integrity of the soil beneath the structure and that the concrete forms are functioning as intended. Bonds required. Prevailing wages.

James Legerme
 Login or create an account
 Login or create an account

Owner: Dallas-Fort Worth International Airport (DFW) TX

Published 12/01/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.