ID 735390
Denton County
Owner Reference: Brown and Caldwell Project No. 196574
Bid Date: 01/21/2025 at 02:00pm
19 Days until bid date
Pre-Bid: 01/08/2025 @ 01:00pm
Trades: Demolition Contractor, Building Moving, Wrecking & Hauling, Concrete Contractor: Sidewalks, Curbs, Gutters, Driveways, Handicap ADA Ramps. Pedestrian Improvements, CIP Concrete NIGP 913-47, Machinery and Pumps Contractor; Motors & Variable Frequency Drives (VFD's), *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
Demolition of two existing secondary clarifier equipment units. Replacement of two existing clarifier mechanisms with two new clarifier mechanisms including walkway bridges, scum beaches, weirs, scum baffle, and scum pumps. Structural repairs to Clarifiers provided as needed. Bonds required. Prevailing wages.
Grant Gayle
Login or create an account
Login or create an account
Owner: Upper Trinity Regional Water District TX
Published 12/18/2024 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.