CBS ID: 737545
Denton County
Owner Reference: 223112-6
Bid Date: 02/18/2025 at 01:00pm
Pre-Bid: 01/15/2025 @ 11:00am
Trades: Wastewater Treatment Plant/Facility Construction & Repairs WWTP/WRF/OSSF OnSite Sewer, Lift Station, Machinery and Pumps Contractor; Motors & Variable Frequency Drives (VFD's), Pipeline Contractor: Water Mains, Water Lines, Sewer Lines + Related Structures; Includes Pipe Inspection Camera, Roadway Drainage, Stormwater, Manholes & Valve Boxes, Ditches, Culverts, Shoulder Work, Underdrains, Dewatering, Water Swales, Generator Contractor: Electrical & Power Provider, Backup Battery Systems & Uninterrupted Power Supply (UPS) Systems, *General Building Contractor GBC: Building Construction Services, Enclosed Structures; Opportunities for Subcontractors, HVAC Contractor: Heating Ventilating Air Conditioning & Controls, Exhaust Systems, Air Handler/Air Chillers. Includes RTU's, *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
TOM TAYLOR WTP EXPANSION - PHASE IIIB (THIS WORK PACKAGE) In summary, the Phase IIIB Expansion includes construction of the following: Package 2 & 5 Pre-procured Equipment includes: a backup generator with ATS and paralleling switch gear, ozone system equipment, onsite sodium hypochlorite generation equipment, plate settlers, flocculators, Backwash Recovery pumps, Sludge Collectors, chemical feed pumps, chemical storage tanks, VFDs, specialty valves, and any other long-lead equipment. Settled Water Channel Isolation and Bypass: Adds a bypass to route water from the settled water basins and effluent weir channel to the ozone contactors to allow for maintenance and isolation of the settled water channel. Raw Water Meter Vaults: New magnetic flow meters with vaults and modified raw water piping. Rapid mix modifications and additional flow meters and modulation modifications. Flocculation and Sedimentation Basin Improvements: Uprate Basins 1 and 2 by 7.5 MGD each (for a total of 15 MGD) by modifying the flocculation zones and adding plate settlers and hoseless sludge collectors to the sedimentation zones. Replace the sludge collectors in Basins 3 to 6 with hoseless sludge collectors. Repair the Basin 3 construction joint. Backwash Recovery Basin and Recycle Pump Station: Adds a backwash recovery basin and recycle pump station to separate backwash waste from the lagoon. Ozone System Improvements: Replaces the existing ozone diffusers with a side stream ozone injection system and modifies the ozone contactors to increase the hydraulic throughput to 85 MGD. Expands the liquid oxygen (LOX) system by replacing the existing ozone generators, destruct units, supplemental nitrogen system, and monitoring equipment. Adds a chilled water system. Onsite Sodium Hypochlorite Generation (OSHG) Equipment Expansion: Adds a new generator and any necessary ancillary equipment to provide a firm OSHG capacity of 85 MGD. Includes the addition of air conditioning to the OSHG room to allow for OSHG operation during hot summer days. Chemical Feed and Storage Additions: Adds sodium hydroxide storage and containment (85 MGD capacity) and replaces the ammonium hydroxide system with LAS (85 MGD capacity). Electrical, Instrumentation, and Controls: Add a backup generator with ATS and paralleling switch gear. All other miscellaneous electrical improvements and process control additions and/or changes to support the plant uprating to 85 MGD. Sitework and Grading: All necessary sitework and grading to construct the above listed. Bonds required. Prevailing wages.
Shawn Durham
Login or create an account
Login or create an account
Owner: Upper Trinity Regional Water District TX
Published 01/07/2025 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.