Eastland GLO Flood Mitigation Imp-Phase II - Creek Channel Improvements, Eastland, TX

Eastland County

Owner Reference: 8073

Bid Date: 12/05/2024 at 02:00pm
8 Days until bid date

Pre-Bid: 11/21/2024 @ 02:00pm

Estimate: $290,000.00

Trades: Reservoirs, Lakes, Streams, Ponds, Channels, Water Barriers, Aquatic Plants, Wetland Restoration, Living Shorelines NAICS 562998, Vegetation Control & Wildfire Prevention: Burning, Fire Prevention, Mitigation & Mastication, Excavation & Grading Contractor: Blasting, Boring, Trenching, Backfill, Digging - General Engineering Contractor, *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors

Channel improvements of approximately 4,243 L.F. along the South Fork Leon River to the channel shall result in an increase of flow area to reduce impacts of flood events. Work items include but are not limited to regrading/shaping of the channel banks, removal of objectionable vegetation, and snagging (selective removal of snags, drifts, or other obstructions). Bonds required. Prevailing wages.

Jonathan Baum, P.E.
 Login or create an account
 Login or create an account

Owner: City of Eastland TX

Published 11/24/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.