Haskell St. WWTP Secondary Clarifiers Splitter Box 36-inch Sluice Gates-ITB, El Paso, TX

El Paso County

Owner Reference: CMAR - RFEI

Bid Date: 10/08/2024 at 01:30pm

Pre-Bid: 09/25/2024 @ 02:00pm

Trades: Pipeline Contractor: Water Mains, Water Lines, Sewer Lines + Related Structures; Includes Pipe Inspection Camera , Machinery and Pumps Contractor; Motors & Variable Frequency Drives, Roadway Drainage, Stormwater, Manhole Covers & Valve Boxes, Ditches, Culverts, Shoulder Work, Underderdrains, Dewatering, Road S, *General Engineering Contractor GEC; Subcontractor Opportunities

Work: Remove and dispose of four (4) existing sluice gates and associated appurtenances from inside existing secondary clarifiers flow splitter box; install Owner furnished, four (4) new sluice gates and associated appurtenances to replace existing. Work includes furnish, installation, and operation of temporary pumping and piping system to bypass up to 50 MGD of flow going to the splitter box with discharge directed to the center of four (4) existing 145 foot diameter secondary clarifiers; furnish and installation of temporary pipe plugs and one (1) permanent plug to isolate flow from entering and leaving the splitter box as necessary for work on sluice gates; draining the splitter box by pumping as necessary for work on sluice gates; and furnish and installation of temporary diesel powered engines for operation of bypass pumps. Bonds required. Prevailing wages.

Pablo Bram
 Login or create an account
 Login or create an account

Owner: El Paso Water Utilities (EPWater) TX

Published 09/22/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.