SOURCES SOUGHT FY25 Level II Electric Vehicle Charging Station, Fort Bliss, TX

El Paso County

Owner Reference: PANSWD25P0000001511

Bid Date: 12/06/2024 at 04:00pm
15 Days until bid date

Trades: High Voltage Electrical Contractor (HVE): Transmission Lines, Power Lines, Venues, Arenas, Utility, Transformers, Terminal Charging: Electric Vehicle Charging Stations (EVCS); Battery Electric Bus (BEB) & Zero Emissions Vessels (ZEV) or Ferri

238210 - Electrical Contractors and Other Wiring Installation Contractors. This project will provide 8 charging hubs dispersed across Fort Bliss. These hubs will provide an aggregate of 18 Level 2 grid-tied chargers to serve a fleet of Government Zero Emission Vehicles (ZEVs). Electric Chargers must meet FedRamp Certification and be compatible with a Wex card for integration. The contractor will be responsible for the installation of EV chargers, utility connections, and trenching, and will coordinate with Fort Bliss to complete commissioning requirements. Fort Bliss will provide through a separate service contract the network plan & data package required to operate the selected EV Charger installed on-site.

Kristi Morris
 Login or create an account
 Login or create an account

Owner: US Department of the Army (USACE) TX

Published 11/17/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.