**New Bid Date**Methodist Pump Station Generator, Red Oak, TX

Ellis County

Owner Reference: 2024-10-03-14

Bid Date: 10/15/2024 at 02:00pm

Pre-Bid: 09/18/2024 @ 10:00am

Trades: Generator Contractor - Electrical & Power Provider, Backup Battery Systems & Uninterrupted Power Supply (UPS) Systems, Machinery and Pumps Contractor; Motors & Variable Frequency Drives, Site Preparation, Sitework, Prep Work/Prepwork - General Engineering Contractor, High Voltage Electrical Contractor (HVE): Transmission Lines, Power Lines, Venues, Arenas, Utility, Transformers

The project includes construction of a new generator and generator pad at Methodist Pump Station, relocation of the existing generator from the Methodist Pump Station to the Red Oak Government Center, and associated electrical and site improvements at the two sites as detailed in the Construction Plans and Specifications. Bonds required. Prevailing wages.

Holly Deters
 Login or create an account
 Login or create an account

Owner: City of Red Oak TX

Published 09/16/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.