TerraVista Phase 1 - Utilities, Carrollton, TX

Ellis County

Owner Reference: CCT002A

Bid Date: 11/22/2024 at 02:15pm
1 Days until bid date

Pre-Bid: 11/11/2024 @ 02:15pm

Trades: Underground Utility Contractor & Utility Locating Services: GPS, Cabling, Pipes, Power, Telecom, Potholing, Daylighting, Sewer Pump System, Sewer Connection, Septic Tanks & Systems Contractor: OnSite Sewage Facility (OSSF); CIPP liners, *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors

Project scope shall include the Utility Improvements, approximately 17,627 LF of 16” to 8” PVC onsite and offsite water, 9,286 LF of 24” to 8” sanitary sewer, 8,295 LF of 5’ x 4’ RCB through 18” RCP onsite storm sewer, and all related miscellaneous items and appurtenances, all as per NCTCOG, Construction Plans, and Ellis County Municipal Utility District No. 4 specifications to serve 240 lots on approximately 70 acres. The project is located South and West of the intersection of FM 813 and Windham Road in Ellis County, Texas. Bonds required. Prevailing wages.

Chris Wall
 Login or create an account
 Login or create an account

Owner: Ellis County MUD4 Municipal Utility District TX

Published 11/19/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.