TerraVista Phase 1 - WWTP Site & LS, Carrollton, Tx

Ellis County

Owner Reference: CCT002A

Bid Date: 12/06/2024 at 02:45PM

Pre-Bid: 11/11/2024 @ 02:45PM

Trades: Wastewater Treatment Plant Construction & Repairs WWTP/WRF/OSSF OnSite Sewer Facilities Lift Station, Supervisory Control & Data Acquisition (SCADA): Controllers, Process & Data Automation: Hardware/Software on High-Level Machiner, Machinery and Pumps Contractor; Motors & Variable Frequency Drives (VFD's), Pipeline Contractor: Water Mains, Water Lines, Sewer Lines + Related Structures; Includes Pipe Inspection Camera, Low Voltage Electrical Contractor (LVE): Residential Wiring, Telephone/Sound/Cable TV Systems, Fiberoptic, Fiber Optic, Ethernet

Project scope shall include the Wastewater Treatment Plant Improvements: subgrade preparation, access road, fencing, & furnishing and installation of lift station, SCADA equipment, pumps, piping, electrical appurtenances, and all related miscellaneous items and appurtenances, all as per NCTCOG, Construction Plans, and Ellis County Municipal Utility District No. 4 specifications to serve 240 lots on approximately 70 acres. The project is located South and West of the intersection of FM 813 and Windham Road in Ellis County, Texas. Bonds required. Prevailing wages.

Chris Wall
 Login or create an account
 Login or create an account

Owner: Ellis County MUD4 Municipal Utility District TX

Published 11/24/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.