ID 732230
Ellis County
Owner Reference: MDL23813
Bid Date: 12/19/2024 at 11:00am
Pre-Bid: 11/21/2024 @ 10:00am
Estimate: $3 Million
Trades: Wastewater Treatment Plant Construction & Repairs WWTP/WRF/OSSF OnSite Sewer Facilities Lift Station, Dredging Contractor: Water Excavation - General Engineering Contractor
Joe Pool Lake Dredging includes dredging the bowl at the base of the City of Midlothian’s existing intake tower at the Joe Pool Lake Raw Water Pump Station. The volume of the material to be extracted is approximately 20,000 cubic yards. The dredged material is to be pumped to geotextile dewatering tubes to be stages at the City’s Tayman Water Treatment Plant. Bonds required. Prevailing wages.
Construction Services
Login or create an account
Login or create an account
Owner: City of Midlothian TX
Published 11/25/2024 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.