East Ovilla Road TxDOT Utility Relocation Project, Red Oak, TX

Ellis County

Owner Reference: 2024-12-19

Bid Date: 12/19/2024 at 02:00pm

Trades: Pipeline Contractor: Water Mains, Water Lines, Sewer Lines + Related Structures; Includes Pipe Inspection Camera, Roadway Drainage, Stormwater, Manholes & Valve Boxes, Ditches, Culverts, Shoulder Work, Underdrains, Dewatering, Water Swales, Municipal & Underground Utility Contractor & Utility Locating Services: GPS, Cabling, Pipes, Power, Telecom, Potholing, Daylight

The project includes constriction of approximately two-thousand seven hundred (2,700) linear feet of 6 to 8-inch water line, one-thousand five hundred (1,500) linear feet of 6 to 10-inch wastewater line, and one-thousand one hundred (1,100) linear feet of 2 to 4-inch force main as detailed in the Construction Plans and Specifications. The wastewater and water lines begin on the west side of SH 342 approximately at the intersection of South Ryan Drive and East Ovilla Road, continuing east along East Ovilla Road before reaching Methodist Street. The force main begins on the east side of SH 342 approximately at the intersection of Cobblestone Circle and East Ovilla Road and continues east until reaching an access road at Red Oak Eastridge Elementary. Bonds required. Prevailing wages.

Stuart Williams
 Login or create an account
 Login or create an account

Owner: City of Red Oak TX

Published 12/09/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.