ID 729448
Fort Bend County
Owner Reference: 17-020-032-Phase II
Bid Date: 11/14/2024 at 10:00am
Pre-Bid: 11/07/2024 @ 10:00am
Trades: Pipeline Contractor: Water Mains, Water Lines, Sewer Lines + Related Structures; Includes Pipe Inspection Camera , *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors , Fire Protection Systems, Fire Alarm & Fire Suppression Contractor, Fire Pumps & Fire Hydrants, Roadway Drainage, Stormwater, Manhole Covers & Valve Boxes, Ditches, Culverts, Shoulder Work, Underderdrains, Dewatering, Road S
Project consists of pre-chlorinate pipe bursting 6,8, and 12-inch AC waterline with new HDPE / Fusible C900; replacement of misc. fire hydrants, valves, and meter reconnects. Bonds required. Prevailing wages.
Odyssey Engineering Group
Login or create an account
Login or create an account
Owner: Pecan Grove MUD Municipal Utility District TX
Published 11/05/2024 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.