**NEW BID DATE**Wastewater Treatment Plant Modifications, Bellaire, TX

Fort Bend County

Owner Reference: 15300-0004-01

Bid Date: 12/03/2024 at 10:00am
11 Days until bid date

Pre-Bid: 11/12/2024 @ 10:00am

Estimate: 1,800,000

Trades: Wastewater Treatment Plant Construction & Repairs WWTP/WRF/OSSF OnSite Sewer Facilities Lift Station, Pipeline Contractor: Water Mains, Water Lines, Sewer Lines + Related Structures; Includes Pipe Inspection Camera, Site Preparation, Sitework, Prep Work & Prepwork, Concrete Contractor: Sidewalks, Curbs, Gutters, Driveways, Handicap ADA Ramps. Pedestrian Improvements, CIP Concrete NIGP 913-47, Underground Utility Contractor & Utility Locating Services: GPS, Cabling, Pipes, Power, Telecom, Potholing, Daylighting, *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors

The work consists of providing the necessary labor, material, equipment, and supervision to construct Fort Bend County Municipal Utility District No. 190 Wastewater Treatment Plant Modifications. The site work contractor is responsible for all site work, including but not limited to yard piping additions and modifications, headworks modifications; bypass pumping; site work; crushed concrete road modifications and IWTP pad; protective coatings, concrete pads and piping; swales; underground duct banks with conduits; pull boxes at Aeration Basin No. 5 and Digester Nos. 3, 5 and 6; site grading; all associated electrical and site work; facility start-up of new basins; and all else specified and shown in the construction documents and not specifically addressed in lease agreement, complete in place for a fully functioning plant. Bonds required. Prevailing wages.

Nick Heilenman c/o Quiddity Engineering, LLC
 Login or create an account
 Login or create an account

Owner: Fort Bend MUD190 Municipal Utility District TX

Published 11/05/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.