August Meadows Phase 1 Detention, Houston, TX

Fort Bend County

Owner Reference: 22-043-100

Bid Date: 11/21/2024 at 10:00am

Pre-Bid: 11/14/2024 @ 10:00am

Trades: Excavation & Grading Contractor: Blasting, Boring, Trenching, Backfill, Digging - General Engineering Contractor, Sewer Pump System, Sewer Connection, Septic Tanks & Systems Contractor: OnSite Sewage Facility (OSSF); CIPP liners, *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors

Project consists of excavation and storm sewer system for detention and amenity basin to serve August Meadows. Bonds required. Prevailing wages.

Odyssey Engineering Group
 Login or create an account
 Login or create an account

Owner: Fort Bend County MUD252 Municipal Utility District TX

Published 11/06/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.