ID 730219
Fort Bend County
Owner Reference: 2659-2155, 2659-2155C
Bid Date: 12/03/2024 at 11:00am
11 Days until bid date
Pre-Bid: 11/21/2024 @ 11:00am
Trades: Pipeline Contractor: Water Mains, Water Lines, Sewer Lines + Related Structures; Includes Pipe Inspection Camera , Sewer Pump System, Sewer Connection, Septic Tanks & Systems Contractor: OnSite Sewage Facility (OSSF); CIPP liners, Roadway Drainage, Stormwater, Manhole Covers & Valve Boxes, Ditches, Culverts, Shoulder Work, Underderdrains, Dewatering, Road S, Earthwork & Paving Contractor, Asphalt, Land Clearing, Path & Trail Construction: General Engineering Contractor, *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors
Construction of the Water, Sanitary Sewer, Drainage Facilities & Paving and Appurtenances to Serve Harvest Green Section 55. Bonds required. Prevailing wages.
Travis Veillon, P.E.
Login or create an account
Owner: Fort Bend County MUD134F Municipal Utility District TX
Published 11/11/2024 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.