**New Bid Date**Brigeland Development LP Upper Langham Creek Phase 3 Channel and Detention Basin Design, Houston, TX

Harris County

Owner Reference: WP Job No. 2021-415053

Bid Date: 10/15/2024 at 10:00am

Pre-Bid: 09/24/2024 @ 10:00am

Trades: Excavation & Grading Contractor: Blasting, Boring, Trenching, Backfill, Digging - General Engineering Contractor, Sanitation System, Sewer Connection & Septic Tanks & Systems Contractor: OnSite Sewage Facility (OSSF); CIPP liners, Roadway Drainage, Stormwater, Manhole Covers & Valve Boxes, Ditches, Culverts, Shoulder Work, Underderdrains, Dewatering, Road S, Pipeline Contractor: Water Mains, Water Lines, Sewer Lines + Related Structures; Includes Pipe Inspection Camera , *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors

784,933 CY of channel excavation and fill placement. Approx. 494 LF of 4’X3’ RCB storm sewer box and all appurtenances. Approx. 58 LF of 4’X4’ RCB storm sewer box and all appurtenances. Approx. 110 LF of 5’X4’ RCB storm sewer box and all appurtenances. Approx. 395 LF of 6’X4’ RCB storm sewer box and all appurtenances. Approx. 146 LF of 10’X10’ RCB storm sewer box and all appurtenances. Approx. 146 LF of 10’X10’ RCB Pedestrian Tunnel and all appurtenances. Approx. 2728 LF of 24” CMP, 290 LF of 30” CMP, 75 LF of 36” CMP, 82 LF OF 42” RCP, 444 LF of 72” RCP storm sewer pipe and all appurtenances. Bonds required. Prevailing wages.

Daniel Salazar
 Login or create an account
 Login or create an account

Owner: Bridgeland Development LP TX

Published 09/11/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.