200-029 #1 Waterline Rehabiliation, Houston, TX

Harris County

Owner Reference: 200-029 #1

Bid Date: 10/03/2024 at 09:00am

Pre-Bid: 09/26/2024 @ 09:00am

Estimate: $700,000-$600,000

Trades: Pipeline Contractor: Water Mains, Water Lines, Sewer Lines + Related Structures; Includes Pipe Inspection Camera , Fire Protection Systems, Fire Alarm & Fire Suppression Contractor, Fire Pumps & Fire Hydrants, Roadway Drainage, Stormwater, Manhole Covers & Valve Boxes, Ditches, Culverts, Shoulder Work, Underderdrains, Dewatering, Road S, Construction Cleanup Contractor: Refuse & Debris Removal Hauling, Building/Grounds/Structures - General Engineering Contractor

1. Mobilization; 2. installation of water lines; 3. installation of service leads; 4. installation of fire hydrants, 5. valves, and appurtenances; 6. connection of new water line to city’s existing water system; 7. cut, plug, and abandonment of existing waterlines; 8. clean up and restoration. Bonds required. Prevailing wages.

Jacob Floyd
 Login or create an account
 Login or create an account

Owner: City of Bunker Hill Village TX

Published 09/22/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.