Reid Road Municipal Utility District No. 2 Lift Station No. 1-3 Rehabilitation, Houston, TX

Harris County

Owner Reference: 22-044-300

Bid Date: 10/08/2024 at 02:00pm

Pre-Bid: 10/01/2024 @ 02:00pm

Trades: Pipeline Contractor: Water Mains, Water Lines, Sewer Lines + Related Structures; Includes Pipe Inspection Camera , Industrial Painting & Coating Contractor: General Engineering Contractor (Includes Graffiti Removal), Wastewater Treatment Plant Construction & Repairs WWTP/OSSF OnSite Sewer Facilities Lift Station-General Engineering Contractor, Concrete Contractor: Sidewalks, Curbs, Gutters, Driveways, Handicap ADA Ramps. Pedestrian Improvements, CIP Concrete NIGP 913-47

Project consists of pipe coating rehabilitation of the three lift stations within the Reid Road #2 district with additional driveway repair. Bonds required. Prevailing wages.

Odyssey Engineering Group
 Login or create an account
 Login or create an account

Owner: Reid Road MUD2 Municipal Utility District TX

Published 09/30/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.