ID 726597
Harris County
Owner Reference: 05227-0241-01
Bid Date: 10/25/2024 at 10:30am
Pre-Bid: 10/18/2024 @ 10:30am
Estimate: $600,000
Trades: Water Well Construction & Waterworks: Drilling, Installation, Improvements & Repairs - General Engineering Contractor, Machinery and Pumps Contractor; Motors & Variable Frequency Drives, Excavation & Grading Contractor: Blasting, Boring, Trenching, Backfill, Digging - General Engineering Contractor, *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors
The work includes providing bonds and insurance; removing and inspecting the pumping equipment; replace the 200 hp motor; sounding the lap; performing any necessary mechanical and chemical rehabilitation to the well; replacing all column assembly components and accessories to a pump setting of 490 feet (490’); reinstalling the pump, motor, column assembly and accessories; bacteriological testing; performing water well performance test; disinfecting the water well; performing water sampling and testing before and after water well rework; and restoring site grading to original or better condition and hydromulching all areas within the plant site and all other adjacent areas disturbed during this construction. Bonds required. Prevailing wages.
Andrew Alford
Login or create an account
Owner: Harris County WCID109 Water Control & Improvement District #109 TX
Published 10/15/2024 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.