ITB – Drainage Improvements in the Pine Trails Subdivision Phase 1, 2, 5, 6 (2018) for Harris County Precinct 2 (CDBG-MIT / GLO), Houston, TX

Harris County

Owner Reference: 24/0358

Bid Date: 11/11/2024 at 02:00pm

Pre-Bid: 10/29/2024 @ 11:00am

Trades: Roadway Drainage, Stormwater, Manhole Covers & Valve Boxes, Ditches, Culverts, Shoulder Work, Underderdrains, Dewatering, Road S, *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors , Excavation & Grading Contractor: Blasting, Boring, Trenching, Backfill, Digging - General Engineering Contractor, Sewer Pump System, Sewer Connection, Septic Tanks & Systems Contractor: OnSite Sewage Facility (OSSF); CIPP liners, Pipeline Contractor: Water Mains, Water Lines, Sewer Lines + Related Structures; Includes Pipe Inspection Camera

Drainage Improvements in the Pine Trails Subdivision Phase 1, 2, 5, 6 (2018) for Harris County Precinct 2 – UPIN 19101MF14202. Bonds required. Prevailing wages.

Maria Heinzmann
 Login or create an account
 Login or create an account

Owner: County of Harris TX

Published 10/28/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.