CLCWA - Sanitary Sewer Phase 101 Rehabilitation, Houston, TX

Harris County

Owner Reference: 24170-125-10048-000

Bid Date: 11/05/2024 at 01:30pm

Pre-Bid: 10/29/2024 @ 10:00am

Trades: Sewer Pump System, Sewer Connection, Septic Tanks & Systems Contractor: OnSite Sewage Facility (OSSF); CIPP liners, Pipeline Contractor: Water Mains, Water Lines, Sewer Lines + Related Structures; Includes Pipe Inspection Camera , Roadway Drainage, Stormwater, Manhole Covers & Valve Boxes, Ditches, Culverts, Shoulder Work, Underderdrains, Dewatering, Road S, Excavation & Grading Contractor: Blasting, Boring, Trenching, Backfill, Digging - General Engineering Contractor, Traffic Signals, Traffic Calming, Control & Monitoring - Electrical & General Engineering Contractor, Concrete Contractor: Sidewalks, Curbs, Gutters, Driveways, Handicap ADA Ramps. Pedestrian Improvements, CIP Concrete NIGP 913-47, Water Supply & Irrigation Contractor: Reverse Osmosis (RO) Systems, Landscaping Water Sprinkler System, *Landscaping Contractor: Grounds Maintenance Grubbing Fertilizing Sodding Lawn Mowing Rooting Mulch Hardscaping Rockscaping, *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors

In general, this work consists of: 1. Pre-television of lines to be repaired by point repair. 2. Pipe bursting of sanitary sewer lines including service reconnections in kind, remove and replace external drop stack connections, and cleanout replacements. 3. Rehabilitation of sanitary sewer lines by point repair. 4. Removal and replacement of sanitary sewer manhole frame and covers. 5. Trench safety as required per Section 01561. 6. Implementation and maintenance of traffic control when necessary or required. Contractor to note that these plans may not include all necessary Traffic Control plans. Contractor to ensure traffic control is executed as necessary to facilitate work. Contractor is responsible for obtaining any and all permits required for street cuts and/or traffic control. 7. Site restoration including removal and replacement of damaged pavement including subgrade, curb and gutter, pavement markings as necessary and sidewalks, driveways, concrete patios, wooden decks, irrigation lines, turf, plants, shrubs, fences, trees, damaged traffic signaling equipment and other miscellaneous items in the easement or ROW. Bonds required. Prevailing wages.

Sararose Fox c/o Lockwood Andrews & Newnam
 Login or create an account
 Login or create an account

Owner: Clear Lake City Water Authority TX

Published 11/03/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.