ID 729711
Harris County
Owner Reference: 21-009-03-DST
Bid Date: 11/21/2024 at 10:00am
Bids Today
Pre-Bid: 11/14/2024 @ 10:00am
Trades: Pipeline Contractor: Water Mains, Water Lines, Sewer Lines + Related Structures; Includes Pipe Inspection Camera , Sewer Pump System, Sewer Connection, Septic Tanks & Systems Contractor: OnSite Sewage Facility (OSSF); CIPP liners, Earthwork & Paving Contractor, Asphalt, Land Clearing, Path & Trail Construction: General Engineering Contractor, *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors
Project consists of installation of water distribution, sanitary collection, paving and storm water facilities to serve Cedar Pointe Section Three, which is a residential single-family development consisting of 132 lots and approximately 27.8 acres. Bonds required. Prevailing wages.
Odyssey Engineering Group
Login or create an account
Login or create an account
Owner: Crosby MUD Municipal Utility District TX
Published 11/06/2024 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.