TRE Excavation Pond for Project Mercury, Houston, TX

Harris County

Owner Reference: TRE Excavation Pond for Project Mercury

Bid Date: 11/26/2024 at 11:00am

Pre-Bid: 11/19/2024 @ 02:00pm

Trades: Excavation & Grading Contractor: Blasting, Boring, Trenching, Backfill, Digging - General Engineering Contractor, Earthwork & Paving Contractor, Asphalt, Land Clearing, Path & Trail Construction: General Engineering Contractor, Erosion Control: Bank Stabilization, Straw Bombing, Earth, Soil, Sand & Beach Replenishment, Sports & Athletic Fields, Laser Grading, Artificial Turf Maintenance, Football, Baseball, Soccer, Track, Lacrosse, *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors

Scope of work includes excavation and haul off of earthwork to construct a detention basin. Additional work includes an access road to the property, erosion control measures, and turf establishment after the completion of grading. Bonds required. Prevailing wages.

Eric Rogers
 Login or create an account
 Login or create an account

Owner: Northwest Freeway MUD Municipal Utility District TX

Published 11/20/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.