ID 715730
Hays County
Owner Reference: 2024DD-01
Bid Date: 10/09/2024 at 02:00pm
Pre-Bid: 07/31/2024 @ 02:00pm
Trades: Tank Cleaning, Installation & Repair, Pressure Washing: Fiberglass, Steel or Concrete Tanks - General Engineering Contractor, Pipeline Contractor: Water Mains, Water Lines, Sewer Lines + Related Structures; Includes Pipe Inspection Camera , Site Preparation, Sitework, Prep Work/Prepwork - General Engineering Contractor, Fencing Contractor: Heavy Fences, Security Gates, Ornamental Iron, *General Engineering Contractor GEC; Subcontractor Opportunities
Purpose The City of Kyle is requesting Bids for furnishing all labor, materials, equipment, supervision, and incidentals, and for performing all Work required for the following: Project: CR 158 Elevated Storage and Ground Storage Tanks and Pump Station Located at: Along County Road 158 within the Waterstone Development The Work consists of new 1.0 MG composite elevated tank, 0.5 MG ground storage tank, and pump station with related piping, pavement, site work, chemical feed facilities, fencing, and appurtenances. Bonds required. Prevailing wages.
Dan Dellemonache
Login or create an account
Login or create an account
Owner: City of Kyle TX
Published 07/30/2024 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.