IFB 2025DD-04 - Center Street Wastewater Improvements Phase 2, Kyle, TX

Hays County

Owner Reference: 2025DD-04

Bid Date: 12/04/2024 at 03:00pm
11 Days until bid date

Pre-Bid: 11/13/2024 @ 10:00am

Trades: Pipeline Contractor: Water Mains, Water Lines, Sewer Lines + Related Structures; Includes Pipe Inspection Camera, Sewer Pump System, Sewer Connection, Septic Tanks & Systems Contractor: OnSite Sewage Facility (OSSF); CIPP liners, Roadway Drainage, Stormwater, Manhole Covers & Valve Boxes, Ditches, Culverts, Shoulder Work, Underderdrains, Dewatering, Road S, *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors

Proposers are invited for the items and scope of work as follows: 1. Construction of approximately 1,002 linear feet of 18-inch sanitary sewer lines, 846 linear feet of 21-inch sanitary sewer lines, and 92 linear feet of 24-inch sanitary sewer lines. 2. 120 linear feet of 36-inch jacking or boring pipe, 3. Two (2) – 48-inch sanitary manholes 4. Eight (8) – 60-inch sanitary manholes 5. Abandonment of existing wastewater lines/manholes. 6. Surface repairs and restoration Bonds required. Prevailing wages.

Dan Dellemonache
 Login or create an account
 Login or create an account

Owner: City of Kyle TX

Published 11/22/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.