ID 732171
Hockley County
Owner Reference: 5529
Bid Date: 12/05/2024 at 02:00pm
10 Days until bid date
Estimate: $200,000.00
Trades: Pipeline Contractor: Water Mains, Water Lines, Sewer Lines + Related Structures; Includes Pipe Inspection Camera, Roadway Drainage, Stormwater, Manhole Covers & Valve Boxes, Ditches, Culverts, Shoulder Work, Underderdrains, Dewatering, Road S, Fire Protection Systems, Fire Alarm & Fire Suppression Contractor, Fire Pumps & Fire Hydrants, *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors
Distribution piping improvements include 4,863 LF of piping including 30 LF of slick bore with steel casing, gate valves, fire hydrant assemblies, and all related appurtenances. Bonds required. Prevailing wages.
Colden S. Rich, P.E. c/o Enprotec / Hibbs & Todd, Inc.
Login or create an account
Login or create an account
Owner: City of Smyer TX
Published 11/24/2024 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.